A production order is the Business Central document that plans and records the manufacture of a quantity of an item, from component consumption to finished output.
A production order tells Business Central that a specific quantity of a manufactured item has to be produced by a given date. It carries a line for the item being produced, component lines taken from the production BOM, and operation lines taken from the routing. Its status moves through Simulated, Planned, Firm Planned, Released and Finished, and only a Released order accepts consumption, output and capacity postings.
Search with Alt+Q for Released Production Orders, Firm Planned Production Orders or Planned Production Orders depending on the stage you work at. On the order you set the source item, the quantity and the due date, then use the refresh function to explode the BOM and the routing into the component and routing lines. Actual quantities are posted from the consumption journal and the output journal, or from the production journal that combines both.
Released production order 1011 is created for item MG-1000, quantity 25, due date 14 August 2026. After refreshing, the component lines show 25 frames and 51 wheels, and the routing lines show operation 10 at work center 100 and operation 20 at work center 200. The operator posts consumption of the components, then posts output of 25 units with 5.5 hours of run time, and the order is set to Finished.
The most frequent problem is changing the quantity or the due date and not refreshing the order, so components and operations stay sized for the old figure. If the production BOM or the routing is not certified, the refresh stops with a status error telling you the status must be Certified, and no component or operation lines are created until you certify them. Orders left in Released status after the goods are in stock keep work in process open and distort inventory valuation, and posting output before consumption on a manually flushed order leaves the cost of the finished item too low until the components are posted.
Planning routines and cost adjustment can be scheduled as job queue entries so that production data stays current without manual runs. For reading, an AI assistant such as Zentriq Agent can answer questions over this data inside Business Central, for example which released production orders are past their due date, and any record it prepares is a draft that a user reviews and approves before it is posted.
Consumption, output and capacity can only be posted on an order with status Released. Use the change status function to move the order from Firm Planned to Released.
Firm Planned is a committed plan that planning can still adjust and that does not accept postings. Released is the shop floor order that accepts consumption, output and capacity entries.
Zentriq's AI tools automate many of the manual processes around production order in Business Central. Learn about the Zentriq Agent or try Zentriq PunchOut to see how AI simplifies procurement in BC.